Project Description: A contract for suppling of 12 UIC60 turnouts-R190-R300 with concrete...
Project Description: A contract for suppling of 7 UIC60 turnouts-R190-R300 with concrete...
Project Description: Engineering contract, supply of equipment and parts and installation and...
Project Description: Purchase contract of 60 turnout 60E1 (20 right-handed and 20...

Terminated projects

Artaville Steel Company Diverging Line

Project Description: A contract for suppling of 12 UIC60 turnouts-R190-R300 with concrete bearers as well as the pavement equipment (50000 sleeper screws, 50000 guide-plates and 25000 plastic pads) was mutually signed between Iran Rail Industries Co.(IRIDCO.) and Trench Pol Rah...

Salar Railway-Shadmehr Line Project

Project Description: A contract for suppling of 7 UIC60 turnouts-R190-R300 with concrete bearers mutually was signed between Iran Rail Industries Co. (IRIDCO.) and Nasran Company. These turnouts would be installed in Salar- Shadmehr Railway Corridor(EPC). It should be mentioned the...

Al-Mahdi Aluminum Company railway Line Project

Project Description: Engineering contract, supply of equipment and parts and installation and commissioning, factory testing and testing, packaging, transportation and delivery of 15 needles (3 UIC60-R300 and 12 UIC60-R190 needles) for the construction and commissioning of the rail line project...

Connecting Gol Gohar complex to the rail network project

Project Description: Purchase contract of 60 turnout 60E1 (20 right-handed and 20 left-handed with a radius of 300 meters and 10 right-handed and 10 left-handed with a radius of 190 meters) in accordance with the technical specifications of the latest...