Logo En IRID

Categories

Related Articles

Project Description: A contract for suppling of 7 UIC60 turnouts-R190-R300 with concrete...
Project Description: Engineering contract, supply of equipment and parts and installation and...
Project Description: Purchase contract of 60 turnout 60E1 (20 right-handed and 20...
Project Description: Contract for the purchase of 5 UIC60R190 turnout with an...

Artaville Steel Company Diverging Line

پروژه خط فرعی شرکت فولاد آرتاویل

Project Description:

A contract for suppling of 12 UIC60 turnouts-R190-R300 with concrete bearers as well as the pavement equipment (50000 sleeper screws, 50000 guide-plates and 25000 plastic pads) was mutually signed between Iran Rail Industries Co.(IRIDCO.) and Trench Pol Rah Engineering Company for Artaville Steel Co.’s 7 km length diverging track. It should be mentioned the designing and suppling of the equipment would be carried out by IRID as per the technical specifications of the latest version of the European code(REV2011),(EN13232,EN13674).

 Artaville Steel Company Diverging Line

Share this article