Project Description: A contract for suppling of 12 UIC60 turnouts-R190-R300 with concrete...
Project Description: Engineering contract, supply of equipment and parts and installation and...
Project Description: Purchase contract of 60 turnout 60E1 (20 right-handed and 20...
Project Description: Contract for the purchase of 5 UIC60R190 turnout with an...

Salar Railway-Shadmehr Line Project

تصویر پروژه محور راه¬آهن سالار - شادمهر

Project Description:

A contract for suppling of 7 UIC60 turnouts-R190-R300 with concrete bearers mutually was signed between Iran Rail Industries Co. (IRIDCO.) and Nasran Company. These turnouts would be installed in Salar- Shadmehr Railway Corridor(EPC). It should be mentioned the designing would be carried out as per the technical specifications of the latest version of the European code (REV2011),(EN13232,EN13674) by IRID.