Related Articles

Coinciding with the magnificent funeral and farewell ceremony for the pure body...
The CEO of the knowledge-based Iranian Rail Industries Development Co. (IRID) announced...
The Annual General Meeting (AGM) of Iran Rail Industries Development (IRID) for...
Iran Rail Industries Development (IRID) has announced a 40% increase in the...

Manufacturing of railway switches for line 3 of Mashhad Urban Railways Organization (MURO)

According to a report by the Iran Rail Industries Development Co’s (IRID’s) Public Relations Office, a mutual contract for manufacturing the turnouts for the 1st phase, the construction project of the line 3 of Mashhad Metro, was signed between IRID and Mahd Sazeh Petro-Omran Company in 11.04.1402(2.July.2023).

It should be mentioned the contract contains the following items: -Designing and engineering, -Manufacturing of equipment and components, -Installation and putting into operation of simple and crossover turnouts according to the technical specifications of the contract. These turnouts would be manufactured and installed between Shohada-Terminal stations of line 3 of Mashhad Urban Railways Organization (MURO)

as per the standard and warranty card within the coming 6 months by IRID Co.

Share this article

Leave a Comment

Your email address will not be published. Required fields are marked *