- Home
- ProductsTurnoutsA set of devices that guide the train from a straight track to ... Turnout componentsA turnout is composed of forged, casting, machined ... Fastening systemsA fastening system in a turnout consists of: screws spikes, ... Buffer stopA buffer stop is a device, installed at the end of rail tracks... Rail Expansion JointThe Iran Rail Industries Development Company, ... 
- Services
- News and Articles
- Projects
- Irid Group
- Contact Us
- > Projects
- > Bostan Abad-El goli axis railway project

Related Articles
Project Description: The contract for the purchase and transportation of crossover equipment...
Project Description: Purchase contract of 300 units of UIC60R300 turnout with concrete...
Project Description: The contract for the purchase and transportation of crossover equipment...
Bostan Abad-El goli axis railway project
 
															The contract for the supply of turnouts for the Bostan Abad – El Goli railway project was concluded on 09/24/2019 with the mother company specializing in the construction and development of transportation infrastructures in the country.
The subject of the contract is the supply of 56 turnouts of the Bostan Abad-El Goli railway axis and the length of the route is 71 kilometers. And it will reduce about one hundred kilometers along this route.
The Mianeh axis – Tabriz is 203 km long and includes 4 stations, the operation of this line will save time, increase safety and develop the region.






 
								