- Home
- ProductsTurnoutsA set of devices that guide the train from a straight track to ... Turnout componentsA turnout is composed of forged, casting, machined ... Fastening systemsA fastening system in a turnout consists of: screws spikes, ... Buffer stopA buffer stop is a device, installed at the end of rail tracks... Rail Expansion JointThe Iran Rail Industries Development Company, ... 
- Services
- News and Articles
- Projects
- Irid Group
- Contact Us
- > Projects
- > Salar Railway-Shadmehr Line Project

Related Articles
Project Description: The contract for the purchase of 68 items of turnout...
Project Description: A contract for suppling of 12 UIC60 turnouts-R190-R300 with concrete...
Project Description: Engineering contract, supply of equipment and parts and installation and...
Project Description: Purchase contract of 60 turnout 60E1 (20 right-handed and 20...
Salar Railway-Shadmehr Line Project
 
															Project Description:
A contract for suppling of 7 UIC60 turnouts-R190-R300 with concrete bearers mutually was signed between Iran Rail Industries Co. (IRIDCO.) and Nasran Company. These turnouts would be installed in Salar- Shadmehr Railway Corridor(EPC). It should be mentioned the designing would be carried out as per the technical specifications of the latest version of the European code (REV2011),(EN13232,EN13674) by IRID.

 
								